PEAB Kållered

Drilling sludge posed challenges for Peab in Kållered Drilling sludge and stringent water treatment requirements nearly caused complications for Peab during the construction of a large warehouse in Kållered. Traditional methods proved insufficient. Peab is actively...

Pre-study West Link

Good results in the pre-study before the construction of the West Link Project Olskroken is one part of a much larger regional infrastructure strategy, which also includes the rail connection through central Gothenburg known as the West Link. During the construction...

Treatment of drilling sludge

“A new standard for particle separation” The drilling of new pipeline tunnels under Gothenburg generates fine-grained stone flour. Swedish Hydro Solutions was hired to treat the water in a very confined space. – Filtration is extremely effective for...

Jernhusen, Region City

The drill water became crystal clear During a geotechnical field study for a city development project at Gothenburg Central Station, property manager Jernhusen needed a water treatment solution that were able to clean drilling water. Swedish Hydro Solutions was the...

Washington Park Arboretum

The Japanese garden in Seattle When a major water pipeline burst above the Japanese Garden in Washington’s Arboretum, large amounts of soil, oil, chlorine, and other contaminants were flushed into the garden’s ponds with valuable Koi fish. The contaminants...